Oasis 4 was partially completed in 2013. The Project included 6,400 pavers and 10 signs. Oasis 4 served16 lots. The Oasis 4 Project site is on SE 2nd Street, between South Federal Highway and NE 3rd Ave.
- Pavement in intersection removed
- Redesign with better drainage
- Swale drainage
- 2 crosswalks
- Speed table/crosswalk East of IHOP.
The community clean-up event held on April 12, 2014 included City staff and volunteers that collected 20 bags of trash and 20 cubic yards of bulk items.